27.09.2022

Eiffage Métal has installed the first transition piece on the "Provence Grand Large" project

A milestone has been reached on the "Provence Grand Large" project! The first transition piece has been successfully installed at the top of the float at our site in Fos-sur-Mer.

Eiffage Métal has installed the first transition piece on the

This project, for which we are producing the floats for our client SBM Offshore, is being carried out by EDF Renouvelables and Maple Power Ltd. Located more than 17km from the coast, it will be the first pilot project of floating wind turbines in France.

The transition piece is the interface between the float and the mast of the wind turbine.

to discover also