23.08.2022
Salpêtrière bridge : Eiffage Métal carried out the second jacking
Discover the images of the second launching of the framework of the Salpêtrière bridge linking the Pitié Salpêtrière hospital to the avenue Pierre Mendès France by flying over the tracks of the Austerlitz station in Paris.
With a total length of 82 m and a width varying from 19 to 32 m, this structure weighs more than 2,000 tonnes and constitutes a new pedestrian, cycling and road link.
Congratulations to our teams for their work, especially those in Lauterbourg !
MOA : Semapa
MOE : Arcadis, WilkinsonEyre
Group of companies : Eiffage Métal, Razel-Bec, Fayat Fondations
-
18.04.2024In Monaco, Eiffage Metal orchestrates the airlifting...After several months of design by our engineering and manufacturing services, we are pleased to announce the installation of two masts, 28 and 38 meters high, at...
-
27.03.2024The students from the Builders engineering school in...Paul Queric, project engineer at Eiffage Métal, shared his experience with the students of Builders - Engineering School, regarding this large-scale project.
-
06.03.2024CNES testifies on the construction of the Ariane 6...In this video, Pierre Guilhem from CNES explains how Eiffage Métal designed and built the Ariane 6 mobile gantry, enabling CNES to meet its target of twelve launches...