13.07.2022
On the Fos-sur-Mer site (13), the three floats of the "Provence Grand Large" project are taking shape
The three floats for the "Provence Grand Large" project are taking shape at our Fos-sur-Mer site! The impressive assembly of these structures supporting the future offshore wind turbines is being carried out by our teams and those of our Belgian subsidiary Smulders.
![On the Fos-sur-Mer site (13), the three floats of the](/files/live/sites/metal/files/actualite/pgl-flotteurs_1.jpg)
Provence Grand Large, the first floating wind farm in France, will be installed 17 km off the coast, less than 30 km from our assembly yard.
This project, which we are carrying out for our client SBM Offshore, is supported by EDF Renouvelables.
-
04.07.2024Eiffage consortium wins the contract to build four...Eiffage, through its Belgian Eiffage Métal subsidiary Smulders, in a consortium with HSM Offshore Energy and Iv‑Offshore & Energy recently secured the EPCIC[1] contract...
-
06.06.2024Eiffage Métal signs the new glass roof of the headquarters...For over three years, the Eiffage Métal teams have been involved in the design, fabrication, and installation of the glass roof of the atrium in the building, located...
-
18.04.2024In Monaco, Eiffage Metal orchestrates the airlifting...After several months of design by our engineering and manufacturing services, we are pleased to announce the installation of two masts, 28 and 38 meters high, at...