05.08.2020

2nd bridge launched on the TTME at Ris-Orangis

During the night of 16 to 17 June, in Stéphane Beaudet’s presence, Mayor of Evry-Courcouronnes, and all those involved in the operation, teams from Eiffage Génie Civil and Eiffage Métal completed the launch of the second mixed structure of the future Massy-Evry Tram-Train (T12), which now crosses the A104 - Francilienne - and the A6 motorway.

2nd bridge launched on the TTME at Ris-Orangis

The launching of this 95 m long and 12 m wide bridge required the simultaneous closure of these two major roads. A first, reiterated 3 nights in a row! Initially scheduled for March 23rd, this stage has been meticulously prepared by our teams, in partnership with the Dirif, in compliance with the new post-Covid working conditions.
 
Our teams, who have been working 28 months on this line which will be commissioned in 2023, will complete this structure by the end of the year, as well as two concrete booms (200 m and 300 m) and another mixed bridge.

Photos Credit : Eiffage Génie Civil

to discover also